Ram project has slowed down, but it is speeding back up
I have collected 99% of the materials needed to complete the conversion.
Since last posting:
The L tank has been outfitted with the sending unit, and Hotfox
I taped where the hole was to be cut in order to protect the paint. Also coated the hole saw with grease to catch the metal shavings
Here is the blurry whole cut in the bed for the Hose in Hose plumbing
Veggie Gauge has been installed down by the transfer case shift lever with a stock panel screw
Davco 382 bracket has been completed minus brushing
The Davco 382 is a huge filter my bracket barely allows the filter to fit.
Ample use of grinder and this sanding tool to make adjustments
Snug
Also fixed the cup holder problem the other day by breaking it when pushing down my french press
The stock cup holders are notorious for being to shallow and ejecting fluids at passengers. The bottom piece broke and fixed itself
Maybe tomorrow I will fix the other one. Works with medium sized drinks minus the handle as well.